Sep 17, 2015
The entrances are now in the process of placing metal panels, glass, doors and stone finishes. The final stage will be installation of concrete and landscaping.
May 27, 2015
Entrance 2, 3 and 4 are under demolition. The glass facade and exterior glass doors have been removed. They’re currently being prepped for framing. The renovation process is expected to take another 60 days.
ENTRANCE 2
![Entrance 2_Sep17](https://www.manassasmall.com/wp-content/uploads/sites/6/2016/09/Entrance-2_Sep17.jpg)
![0513 043 (2)](https://www.manassasmall.com/wp-content/uploads/sites/6/2016/09/0513-043-2.jpg)
ENTRANCE 3
![Entrance 3_Aug31RESIZE](https://www.manassasmall.com/wp-content/uploads/sites/6/2016/09/Entrance-3_Aug31RESIZE.jpg)
![Entrance3_Day 2](https://www.manassasmall.com/wp-content/uploads/sites/6/2016/09/Entrance3_Day-2.jpg)
ENTRANCE 4
![Entrance 4_Sep17](https://www.manassasmall.com/wp-content/uploads/sites/6/2016/09/Entrance-4_Sep17.jpg)
![Entrance 4](https://www.manassasmall.com/wp-content/uploads/sites/6/2016/09/Entrance-4.jpg)