The photo below was taken from inside Autobahn. This month, their sound system was installed and decorative finishes was applied to the floor and rubber track was installed.

The photo below was taken from inside the expansion common area. Installation of light fixtures began this month and wood laminate was installed at the top of the columns. Tile work began this month as well.

The photo below was taken from outside Entrance 1. This month, glass was installed on the metal canopy above the entrance doors and signage was installed.

The photo below was taken from outside Entrance 6. This month, light fixtures were installed in the entrance vestibule and the installation of metal coping was completed. Additionally, signage was installed.

The photo below was taken from outside the Kraze Burger space. This month, the storefront glass panels were installed and underground plumbing was completed.

The photo below was taken from inside Uptown Alley. This month, framing continued on the interior of the space. The temporary wall leading into the common area was taken down and HVAC were installed. Additionally, the finishing on the platform was applied.