The photos below were taken from inside the expansion common area. This month, tile installation completed and tile grouting is 85% complete. In addition, limited benches and landscaping were installed in front of the Autobahn common area.
The photo below was taken from outside Autobahn. This month, the final inspection completed and their grand opening was held on Wednesday, May 11th.
The photos below were taken from inside and outside the Kraze Burger space. This month, contractors enclosed their underground plumbing and installed a store front barricade.
The photos below were taken from the exterior and interior of Uptown Alley. This month, their storefront glass panels and temporary barricade were installed and work on the exterior patio and entrance continued. Additionally, framing, dry wall and overhead electrical work continued in the interior of the space.